Skip to content
Underground power trench at a Leumeah home
Level 2 electrical

Overhead to Underground Conversion Campbelltown

Swap the overhead line for a cable in the ground, from the Endeavour Energy network to your meter board.

Get a free quote

Takes a minute. We'll call you back, usually the same day.

No obligation. Your details stay with us and are never sold or shared.

Campbelltown’s older estates and town-centre streets are supplied by overhead lines from street poles to a raiser or bracket on each house. On acreage in Kentlyn, Denham Court, Gilead and the rural edges, power often runs further, across private poles to the house and sheds. New estates are underground from the start. If you’re on an overhead supply and the line is causing trouble, an overhead to underground conversion replaces it with a cable in conduit.

Why Campbelltown owners go underground

  • Rebuilds. New two-storey homes rarely suit the old line’s route.
  • Second storeys and carports. The line clashes with new upper floors and tall carports.
  • Storms. South-west Sydney storms bring branches down on lines.
  • Acreage poles. Removing ageing private poles ends the maintenance and the storm risk.
  • Granny flats. Building a flat under or near the line causes clearance problems.

How the connection works

In streets with overhead mains, the usual method is to run the new cable to the base of the nearest suitable Endeavour Energy pole and up it in protective conduit to the mains. In streets with underground mains, it connects at the boundary pit. On acreage, the connection point may be at the road frontage with a long trench to the house. We confirm the method with Endeavour Energy before quoting.

The trench

Campbelltown ground is often clay and shale, with rock on some ridges. We plan the shortest practical route, cut concrete neatly where needed and avoid tanks, septic systems and trees on acreage. Conduit goes in at the required depth with marker tape above it.

While the trench is open, size the cable for the future. A three phase power upgrade for solar, a battery or an EV charger costs little extra now.

Connection day

We notify Endeavour Energy, isolate, pull through and terminate the new cable, test and restore power. Then the old overhead line, bracket and any private power poles are removed. You get a certificate of compliance.

Rebuilds

On a knockdown rebuild, plan the underground supply with the builder from the start. We disconnect the old house, set up a temporary builders supply, and connect the new supply when the meter board is ready.

Renewal areas

In areas being renewed, such as parts of Claymore, Airds and Minto, older homes are being replaced with new ones. Builders on those sites usually go underground from the start.

Locating other services

Before we dig, we check where water, gas, NBN and stormwater run, and on acreage where tanks and septic lines are.

How long it takes

A suburban trench is usually a day plus a connection visit. Acreage runs take longer and are staged.

Living with the trench

Most of the mess is the trench itself, from the pole or pit to the meter board. We plan the route around gardens, paths and pools, and where a driveway is in the way we can bore under it instead of cutting it. The ground is backfilled and compacted, and the old overhead line, bracket and raiser come off once the new cable is live, so the front of the house looks cleaner straight away.

Pits and conduit

The cable runs in heavy-duty conduit, with a pit where the route turns or runs long, so a future upgrade can pull new cable through without digging the yard up again. If three phase might be on the cards later, tell us and we’ll size the conduit for it.

Get a quote

Call the Campbelltown level 2 electrician team for a site visit and a fixed written price. We’ve undergrounded homes and acreage across the City, including in level 2 electrician Leumeah and Kentlyn.

Updated

The price depends on the trench length, ground and surfaces, the connection point and Endeavour Energy's requirements. Acreage runs cost more. We confirm on site and give you a fixed written price.

What good overhead to underground conversion looks like

Close-up of overhead to underground conversion on a home in the Campbelltown area
What overhead to underground conversion looks like up close on a typical Campbelltown area home.
Signs that overhead to underground conversion needs attention
Typical signs that it needs attention.

Overhead to Underground Conversion in Campbelltown: step by step

  1. Plan the trenchWe find the connection point and plan a route around driveways, sheds, tanks and trees.
  2. Confirm the connectionWe check with Endeavour Energy whether it's a pit or a cable up the nearest pole.
  3. Lay the conduitConduit at the required depth with marker tape, trench backfilled.
  4. Connect and removeNew cable connected and tested; the old line and any private poles come down.

Overhead to Underground Conversion questions in Campbelltown

Something else on your mind? Call 02 9158 9997 and ask.

Is the ground in Campbelltown hard to trench?

Clay and shale are common, and some ridges have rock. We allow for the ground we find on site.

Can we go underground on acreage?

Yes. Long runs cost more, but they remove private poles and overhead lines for good.

Do new estates already have underground power?

Yes. Gilead, Menangle Park and other new estates are built with underground supply.

Need a Level 2 electrician in Campbelltown?

📞 Call now Free quote