Temporary Builders Supply Campbelltown
Safe, metered site power on the Endeavour Energy network from the first day of the build.
Every Campbelltown build needs safe site power from day one: new homes on fresh lots in Gilead and Menangle Park, knockdown rebuilds in the established estates, renewal projects in Minto, Claymore and Airds, and new homes and sheds on acreage. A temporary builders supply gives the trades a metered connection to the Endeavour Energy network, with safety switches and outlets.
Three kinds of site
New estates. Gilead, Menangle Park and other new areas have underground mains. A site board connects to the boundary pit.
Established streets. Overhead mains on poles. A temporary pole near the frontage takes an overhead service.
Acreage. The connection point may be at the road frontage, far from the build. We set up there and plan how power reaches the building area.
The right order
First the old house, if there is one, is permanently disconnected, and site power goes in on the same visit. The build runs on site power until the new meter board is ready. Then we connect the permanent supply and remove the temporary one. Our power disconnection and reconnection page covers the first step. If the home will have big solar, a battery or EV charging, lodge the three phase power application early.
What we need
Send us the address, the builder’s details, a site plan, whether you need single or three phase, the start date, and confirmation that a retailer account is open for the site.
Renewal and multi-lot sites
Builders working several lots, in renewal areas or new estates, can book site power and final connections across all of them as one program. We work to the builder’s schedule and lodge applications as soon as lot details are confirmed.
Safety on site
Temporary supplies get knocked by machinery and splashed with concrete. We install them to cope, with the protection the rules require. If an overhead line runs near the work area, we advise on keeping cranes and scaffold clear, and can arrange isolation during critical work.
Common hold-ups
No retailer account, so no meter. The pole placed where the slab or driveway goes. Single phase ordered for a three phase home. Demolition booked before disconnection. We go through each at the start.
Moving it mid-build
When the driveway is poured or landscaping starts, the site supply may need to move. We relocate it with a short disconnection if we know a few days ahead.
Weather
Summer storms and heat are hard on site equipment. If the supply is damaged, keep the trades clear and call us.
At handover
We connect the permanent supply, test and certify, and remove the temporary supply. You get the certificate of compliance for the permanent connection.
Pole or board
On overhead streets, a temporary pole near the front boundary takes a service line from the street pole, with a meter and outlets for the trades. On underground streets in Gilead and the renewal areas, a freestanding site board sits beside the pit. Either way it has safety switches, weatherproof outlets and a lockable meter space. If the slab or driveway is going where the supply would naturally sit, we put it to one side so it doesn’t have to move mid-build.
Approvals for the permanent supply
While the build runs on site power, we lodge the paperwork for the permanent connection, and three phase if it’s needed, so the home can go live as soon as the meter board is finished. Waiting until handover to start that paperwork is the most common reason a finished home sits without power.
Sharing with neighbours
On renewal and estate sites, two or three neighbouring lots sometimes start within weeks of each other. Each lot gets its own metered supply, but we can plan the placements together so trucks and pumps have room and nothing ends up where the next lot’s driveway goes.
Book site power
Site power bookings come in from builders in level 2 electrician Raby, the Gilead estates and the Minto renewal streets. Ring the Campbelltown level 2 electrician team with your start date.
Updated
What good temporary builders supply looks like
Temporary Builders Supply in Campbelltown: step by step
- Choose the spotWe place the supply clear of excavation, trucks and scaffold.
- PaperworkEndeavour Energy notified by us; you get the exact wording for your retailer account.
- InstallTemporary pole or site board connected and tested.
- Change overPermanent meter board connected and certified; the temporary pole or board is taken away.
Temporary Builders Supply across Campbelltown
Temporary Builders Supply questions in Campbelltown
Something else on your mind? Call 02 9158 9997 and ask.
We're building in Gilead. How does site power work?
New estates have underground mains, so a site board connects to the pit at your boundary.
Can a renewal builder book several lots at once?
Yes. We schedule site power and connections across all lots.
Can site power be three phase?
Yes, if three phase is available.
Related services
Power Disconnection and ReconnectionSafe disconnection and reconnection of the network supply for renovations, demolitions, re-roofing and switchboard work.
Three Phase Power UpgradeUpgrading a single-phase home to three phase power for EV chargers, ducted air conditioning, pools and big renovations.